DOCUMENTATION · TOOL GUIDE 3 OF 3

MBI Intelligence System

Six sequential AI phases turn your uploaded plans and Calculator data into a complete, divisioned construction budget — Architectural through Plumbing, compiled into one Executive Summary.

1. Upload & Context
2. Run Phases 1–5
3. Run Summary
4. Export

Sending data from the Measurement Calculator first (see that guide) gives every phase real field-measured quantities to work from instead of relying only on plan-reading.

📹 Prefer a video walkthrough? Full video walkthroughs for the MBI Intelligence System are in the works — check back here for the link once they're live.

01

Getting Started

One page, not a wizard

Everything lives on a single scrolling dashboard: Project Information, an optional Project Metrics panel, plan upload, Phase Context fields, the six phase buttons, and your report — all on one page, not a step-by-step wizard.

Project Information

Firm details, company logo, project name, report language, client name, report type, address, and jurisdiction/occupancy/construction-type/codes. These are always manually entered — MBI never generates code-citation fields itself, since getting a code reference wrong carries real professional-liability risk.

Project Metrics (optional, collapsed by default)

Total SF, floor count, ceiling height, partition LF, door count, project type, city, existing conditions, and scope definition. Expand it if you're entering these by hand rather than via the Calculator Bridge (Section 07).

First-run acknowledgment

Before your very first phase run ever, a one-time accuracy notice appears and must be acknowledged — a persistent reminder banner stays visible above the phase buttons afterward: "Even at High Confidence, this estimate only reflects what the plans and Phase Context specify — verify field conditions before bidding."

02

Uploading Plans

One upload field for the whole project

A single file field accepts multiple PDFs or images at once. It isn't per-phase — the same field is reused for every phase you run, and nothing clears it automatically between runs. An upload-hint banner changes its wording per phase to suggest what to upload next (e.g. floor/finish plans for Phase 1, HVAC/equipment schedules for Phase 3) — but that's advisory text only, it doesn't restrict or sort your files for you.

Running each phase for real

For an accurate analysis, swap the files in the upload field to match each phase before you click that phase's button — architectural/finish plans for Phase 1, structural plans for Phase 2, mechanical schedules for Phase 3, and so on.

Quick Visual Analysis — Renders & Images Only

A separate, faster shortcut button that uploads whatever's in the field to every phase at once for a rough visual-only pass. It's explicitly labeled for renders/images, not real construction plans — for an actual project estimate, use the phase-by-phase workflow above instead.

03

The Six Phases

#PhaseCoversHas Phase Context
1ArchitecturalDiv 02, 06, 07, 08, 09, 10 — demolition, all wall framing, insulation, doors/windows/openings, finishes (flooring, paint, tile, ceiling), and manufactured specialty items.No
2StructuralDiv 03, 04, 05 — concrete, masonry (existing CMU untouched unless plans show new), structural steel.Yes
3MechanicalDiv 23 — HVAC equipment, ductwork, controls.Yes
4ElectricalDiv 26 — service/panels, lighting, conduit, data/IT, emergency lighting, EV charging.Yes
5PlumbingDiv 22 — all fixtures, trim, and rough-in piping.Yes
SummaryExecutive SummaryCompiles every completed phase into one Consolidated Grand Total — no new line items, only division subtotals.No

Phases run in strict order

Phase 1 is unlocked from the start; every phase after it stays locked ("Complete the previous phase first") until the one before it finishes. Re-running an already-completed phase clears every phase after it and re-locks their buttons, since Summary is built from all five phase outputs together.

Run All Phases Automatically

A single button runs Phases 1 through 5 and then Summary back-to-back, using whatever's currently in the upload field for every phase — best suited to a first quick pass, or to projects genuinely covered by one combined plan set.

Summary needs no upload

It automatically compiles the stored results from Phases 1–5 — you don't upload anything for it, and it never repeats individual line items, only division subtotals rolled into one Grand Total.

04

Phase Context Fields

Phases 3, 4, and 5 each have their own tab of fields you fill in before running that phase — Phase 1 and Phase 2 have none. These give the AI details plans don't always show clearly. Watch the field labels carefully: several are worded to prevent a specific, common mix-up.

Read the field carefully — count vs. capacity
Tonnage, MBH, CFM, HP, Amps, Volts, and pipe/duct size are always a capacity or rating — never a quantity. "Equipment Count" and "Number of Panels" want the number of units or panels, not their size or rating.

Phase 3 — Mechanical

FieldOptions
HVAC System TypeRTU (Rooftop Unit) · Split System · VRF/VRV · Chilled Water/AHU · Fan Coil Units · No HVAC Work
Equipment Count (RTU/AHU)Number — count of units, not tonnage
Ductwork ScopeAll New · Reuse Existing · Partial Demo + New · Ductless (mini-split/VRF)
Refrigerant TypeR-410A · R-32 · R-454B (A2L) · R-22 (existing/legacy)
Controls / BASNew DDC Controls · Reuse Existing · Standalone Thermostats · None
Kitchen Exhaust HoodYes · No

Phase 4 — Electrical

FieldOptions
Service Size100A · 200A · 400A · 800A · 1200A · Unknown
Number of PanelsNumber — count of named panels, not amperage
Lighting Fixture TypeLED Troffer (2×4/2×2) · Recessed Can/Downlight · Linear Suspended · Pendant · Track Lighting · Mixed/Per Schedule
Conduit TypeEMT · MC Cable · Rigid Conduit (RMC) · PVC Conduit
Emergency LightingYes · No
EV Charging StationsNumber — 0 if none
Data / IT ScopeBasic data outlets only · Structured cabling (Cat6) · Full IT buildout (IDF/MDF, patch panels) · None
Outlets / Fixtures / SwitchesNumber each — can be typed, or imported directly from Blueprint Tool’s Count tool

Phase 5 — Plumbing

FieldOptions
Pipe MaterialCopper · PEX · CPVC · Cast Iron (DWV) · PVC (DWV) · Reuse Existing
Water HeaterElectric Tank — 40/50 gal · Gas Tank — 40/50 gal · Tankless (Electric) · Tankless (Gas) · None
Grease TrapYes · No
Gas ServiceYes · No
Backflow PreventerYes · No
Fixtures / Floor DrainsNumber each — can be typed, or imported directly from Blueprint Tool’s Count tool

Import from Blueprint Tool

Phases 4 and 5 each have an "Import from Blueprint Tool" button that pulls outlet/switch/fixture counts directly from anything you tallied with Blueprint Tool's Count tool — no retyping needed.

05

Confidence Score

How it's scored

For Phases 3, 4, and 5, a confidence banner tracks what percentage of that phase's context fields you've filled in: 🟢 High Confidence at 80%+ (labeled ±15% estimate accuracy), 🟡 Medium at 50–79%, 🔴 Low below 50%.

Below 50%

Clicking that phase's button opens a warning listing exactly which fields are still empty, with a choice to go fill them in or proceed anyway. Phases 1 and 2 have no context fields, so this check doesn't apply to them.

06

Marking a Phase Not Applicable

Where it is

A small "N/A" button sits next to each of Phase 2, 3, 4, and 5's main button (not Phase 1 — every project has some architectural scope — and not Summary, which is the compiler). Use it for a project with genuinely no scope in that division, e.g. a scope of work with no mechanical changes at all.

What happens

The phase is skipped entirely — no AI call runs, no credit is spent — and the next phase unlocks immediately, exactly as if that phase had completed normally. The button changes to "↺ Undo N/A" if you need to reverse it. The Summary phase still gets a clear note for that division ("not applicable to this project") instead of the division just silently disappearing from your final report.

If the phase already ran

Marking it N/A after a real result exists asks you to confirm first — doing so discards that result.

07

The Calculator Bridge

Two separate things happen in this one panel
It's easy to assume the "Apply to Form" button is what makes the AI use your Calculator data — it isn't. Read both parts below.

The AI's data — fully automatic

Once you click "Send to MBI" in the Measurement Calculator, MBI checks for that data automatically every time you open the page or switch back to this tab — no action needed from you. The panel shows room count, SF, LF, and a plumbing fixture breakdown when data is present, or "No data — press Send to MBI in Calculator first" when it isn't. If the data is more than 24 hours old, it's flagged: "Synced from Measurement Calculator (stale — check before using)." Every phase you run automatically uses this data in the background, regardless of anything else on the panel.

"Apply to Form" — a separate convenience

This button only pre-fills the visible SF/LF/door-count/project-name fields on this page for your own editing and reference — it does not control what the AI uses. Dismissing it with the ✕ only clears that local pre-fill; your synced project data is unaffected and the AI keeps using it exactly as before. If Calculator sends newer data, you'll need to click "Apply to Form" again to pull the new numbers into the visible fields — but the AI already picked up the newer data automatically, with no click required.

08

QC Agent Review

Runs automatically — no button to press

After every phase finishes (except the visual-only render mode), a quick second AI pass checks the output's formatting and — for Phase 1 when Calculator data is present — cross-checks that your verified Floor SF, Framing LF, door count, and opening counts actually show up correctly in the report text.

What you'll see

✅ green "QC PASS" if everything checks out; ⚠ amber "QC REVIEW — Check before submitting" with a short bullet list of what to look at if something's off.

Professional and Enterprise only

On Takeoff and Field Operator plans, you'll see a neutral 🔒 "QC Agent Review is available on Professional and Enterprise plans" banner instead — not an error, just a locked-feature notice that appears after every phase.

09

Reviewing Your Report

Beyond each phase's own division tables, MBI automatically builds several report sections around your AI output — all generated from your entered fields, not by the AI itself:

Cover Page
Project name, client, address, tier, location, date, and a confidentiality footer.
Project Identity Page
Jurisdiction, occupancy, construction type, applicable codes — only shown if you filled in at least one of these, and always manually entered, never AI-generated.
Exclusions & Clarifications
A standard list, with extra lines that appear automatically depending on your project's scope (kitchen, storefront, IT, shell condition).
Pricing Basis & Tier Assumptions
Explains specific pricing decisions behind the numbers — e.g. why a luxury-tier item costs more than a flat percentage markup would suggest.
Cost per SF Banner
If you entered project SF (and optionally a client target budget), shows $/SF and, if a budget was entered, an over/under variance.
10

Exporting Your Report

Download CSV

A real generated file — every division table exported as spreadsheet rows.

Download XLSX

Also a real generated file, built the same way as CSV. It's loaded from an online library rather than bundled with the app, so an internet connection is required for this specific export.

Download PDF

This opens your browser's print dialog with a formatted layout (including your cover page and company logo) rather than generating a file directly. In Chrome, uncheck "Headers and footers" in the print dialog for a clean result, and choose "Save as PDF" as the destination.

If a report was cut off
CSV and XLSX exports will ask you to confirm before exporting an incomplete report: "This report was cut off due to length and may be missing items near the end. Export the incomplete version anyway?" The PDF/print export does not show this warning — if you're exporting a report that showed the truncation banner, double-check it before printing rather than relying on a prompt to catch it.
11

Saving & Loading Projects

ActionWhereBehavior
SaveTop user bar — 💾 SaveSaves under whatever name is in the Project Name field. Saving again with a project already open updates it in place — it does not create a duplicate.
My ProjectsTop user bar — 📂 My ProjectsLists every saved project by name and last-updated date, each with Open and 🗑 Delete.
OpenInside My ProjectsRestores every field, your company logo, and all completed phase results — and correctly re-locks whatever phases hadn’t run yet.
12

AI Credits & Plan Limits

Where to check your balance

Credits aren't shown on the main dashboard — open Settings → Plan & Storage to see "X of Y credits used this period," with top-up options if you're running low (the dashboard's top usage bar only tracks saved-project storage, not AI credits).

What costs a credit

Every successful phase run costs 1 credit — a failed call costs nothing. This is the same shared pool used by Blueprint Tool's Read Dims/Verify and the Calculator's own AI estimate. On a very large project (20+ rooms of Calculator data), Phase 1 automatically triggers a second follow-up call to build a room-by-room cost breakdown — so that one Phase 1 click costs 2 credits total, not 1.

Plan limits are shared across all three tools
Because Blueprint Tool, the Calculator, and MBI all draw from the same monthly allowance, heavy use of one can leave less for the others in the same billing period. There's also a hard cap of 15 AI calls in any 5-minute window across all three tools combined, to prevent runaway usage.
13

Good to Know

Things that catch people off guard
  • PDF export skips the truncation warning that CSV and XLSX show — check for the truncation banner yourself before printing.
  • "Quick Visual Analysis" uploads the same files to every phase — it's a fast rough pass, not the accurate per-phase workflow.
  • "Apply to Form" doesn't control what the AI uses — that happens automatically in the background regardless of whether you click Apply or dismiss it.
  • A large project's Phase 1 can cost 2 credits, not 1, when the automatic room-by-room follow-up call runs.
  • Report Language sets the AI's writing language, not the dashboard's own interface language.
  • Re-running a completed phase clears every phase after it — since Summary is built from all of them together, you'll need to re-run downstream phases too.
  • Credits live in Settings, not the main dashboard — check Settings → Plan & Storage if you want to see your remaining balance.