📐 Project Scope & Site Conditions — Click to expand▼
Basics
Key Quantities — measure from plans for maximum accuracy
★ These two fields have the highest impact on accuracy. Measure from your plans before running each phase.
Existing Conditions
Scope Definition
Budget
Analysis Settings
Run Analysis
⚠ When to use this button · For renders and images only — uploads the same files to all phases. For real construction plans, always run each phase individually with its correct sheets.
Analysis in Progress
0%
Initializing...
1
Phase 1 — Architectural
Div 02, 06, 08, 09, 10 · Finishes, Doors, Millwork
2
Phase 2 — Structural
Div 03, 04, 05 · Concrete, Masonry, Steel Framing
3
Phase 3 — Mechanical
Div 23 · HVAC, RTU, Ductwork, VAV, Diffusers
4
Phase 4 — Electrical
Div 26 · Panels, Lighting, Circuits, Fire Alarm
5
Phase 5 — Plumbing
Div 22 · Rough-in, Drains, Grease Trap, Water Heater
∑
Phase 6 — Executive Summary
Consolidating all phases · Grand Total + Cost per SF
⚠️ Report was truncated — the output limit was reached. Run individual phases separately (Phase 1, 2, 3) for complete results, then use Summary to combine them.